SeaDoo GTX DI Operations Instructions Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
10
OPERATING INSTRUCTIONS
For the GTX DI model, follow the in-
structions given for the GTX series
and 3-up seat models in the 2002 Op-
erators Guide (P/N 219 000 145).
SPECIAL PROCEDURES
Towing the Watercraft in
Water
It is the same as explained in the 2002
Operators Guide. Only the hose rout-
ing differs. Refer to the following up-
dated illustration.
GTX DI MODEL
1. Hose pincher on water supply hose on this
side of the T-fitting
CAUTION: When finished towing the
watercraft, hose pincher should be
removed before operating it. Failure
to do so will result in damage to the
engine.
1
F18E01Y
smo2002-005a.book Page 10 Friday, September 7, 2001 11:34 AM
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Comments to this Manuals

No comments